Citytrain

From Wikipedia, the free encyclopedia

Jump to: navigation, search

Citytrain

Service region South East Queensland
Hubs Central, Roma Street, Bowen Hills stations
Depots Mayne Nambour Caboolture Petrie Shorncliffe Ipswich Manly Beenleigh Robina
TransLink zones 1-23
Number of train routes 13
Train transfer Yes
NightLink services Yes: Beenleigh, Caboolture, Ipswich lines
Disability access Handicapped/disabled access At most stations
Website www.citytrain.com.au

Citytrain is the brand name of urban, suburban and inter-urban electric passenger railway services in South East Queensland, Australia. Its network, centering in Brisbane, the state capital of Queensland, is approximately 382 km (237 mi) in route length.[1] Corporately, Citytrain is a part of QR's Passenger Services Group business segment.

[edit] History

Main article: Railways in Brisbane

The first railway in Queensland did not actually run to Brisbane, but ran from Ipswich to Grandchester. Opened in July 1865,[2] the line into Brisbane was not completed until the opening of the Albert Bridge in July 1875.[3]

A start on electrification of the suburban network was approved in 1950 but a change of state government in 1957 saw the scheme abandoned in 1959.[4] It was not until the 1970s that electrification was again brought up, with contracts let in 1975.[5] The first part of the new electric system, the Darra - Ferny Grove line, was opened to the public on November 17, 1979.[6][7] The network was completed by 1988, with a number of extensions made since and additional rolling stock purchased. Services were initially operated under the Queensland Rail brand, with the Citytrain name established in the 1990s.

[edit] Network

The Citytrain network spans South East Queensland

Citytrain operates 10 suburban lines and three interurban lines. Centering in the Brisbane central business district, it extends as far as Gympie in the north, Robina in the south, Rosewood in the west, and Cleveland in the east to Moreton Bay. Each line is ascribed a colour and name on all Citytrain signage and marketing collateral including timetables, posters, and maps.

[edit] Railway stations

See also: List of South East Queensland railway stations

There are 143 stations in the Citytrain network.[8]

[edit] Suburban railway lines

[edit] North of Brisbane
   Airport Line – between Brisbane City and Brisbane Airport
   Caboolture Line – between Brisbane City and Caboolture
   Doomben Line – between Brisbane City and Doomben
   Ferny Grove Line – between Brisbane City and Ferny Grove
   Shorncliffe Line – between Brisbane City and Shorncliffe

[edit] South and west of Brisbane
   Beenleigh Line – between Brisbane City and Beenleigh
   Cleveland Line – between Brisbane City and Cleveland
   Ipswich Line – between Brisbane City and Ipswich
   Corinda via South Brisbane Line – between Brisbane City and Corinda via Tennyson

[edit] Inner Brisbane
   Exhibition Line – loop line between Brisbane City to the Brisbane Exhibition Ground

[edit] Interurban railway lines

[edit] North of Brisbane
   Nambour and Gympie North (Sunshine Coast) Line – between Brisbane City and Gympie

[edit] South and west of Brisbane
   Gold Coast Line – between Brisbane City and Robina
   Rosewood Line – between Ipswich and Rosewood

[edit] Railbus services

Citytrain operates several bus routes along corridors where the railway line has been closed to passenger traffic or supplements low-patronage lines at specific times of the day. These bus services are operated by companies contracted by Citytrain and TransLink.

These Railbus services are:

[edit] Supplementing/replacing the Corinda via South Brisbane line
104 Between Corinda Station and PA Hospital via Yeerongpilly
RailBus service operating Monday to Friday by Brisbane Transport

[edit] Supplementing/replacing the Doomben (Pinkenba) line
303 Between Eagle Junction Station and Pinkenba via Doomben Station
RailBus service operating every day by Brisbane Transport
304 Between Eagle Junction Station and Myrtletown via Doomben Station and Pinkenba
RailBus service operating Counter-peak flow Monday to Friday by Brisbane Transport

[edit] Replacing the Brisbane Valley line
529 Between Toogoolawah and Ipswich via Esk, Coominya and Borallon
RailBus service operating peak flow Monday to Friday by Westside Bus Company

[edit] Supplementing the Sunshine Coast line
649 Between Caboolture and Nambour via Australia Zoo
RailBus service operating off-peak Monday to Friday by Kangaroo Bus Lines

[edit] Operations

Central railway station is the hub of the Citytrain network

Citytrain employs 1,200 staff[citation needed] and operates under the TransLink public transport scheme, the operational, marketing and financial manager of all public transport in South East Queensland.

Citytrain operates approximately 3,000 services per week,[obsolete fact] carrying an average of 1.1 million passenger journeys with a yearly patronage exceeding 57.9 million. In the 2006-2007 financial year, Citytrain reported a patronage increase of 9%, and a 93.6% rate of on-time running, where services arrived at their destination within three minutes and 59 seconds of the time they were scheduled.[8]

The hub of the Citytrain network is Central railway station in the Brisbane central business district, generating approximately 80,000 trips each day.[obsolete fact] Unlike many rail systems that terminate their services in the CBD, Citytrain services typically travel from one side of Brisbane to the other via Central with a three minute layover – mostly to assist in on-time running. For example, a train from Beenleigh, south of Brisbane, will pass through Central after waiting at the major station for three minutes before continuing to Ferny Grove, north of Brisbane.

Citytrain uses narrow gauge track. The line between Brunswick Street and Roma Street stations run underground to some degree, through two sets of tunnels and two stations, Central and Brunswick Street, built-over to harness the airspace for commercial opportunity. The rest of the network is suburban rail, with interurban services running to Nambour and Gympie in the north and between Beenleigh and the Gold Coast in the south. The privately-owned Airtrain service runs to and from Brisbane Airport using Citytrain rollingstock in a commercial agreement with QR, and connects seamlessly with the rest of the network.

As well as the direct interurban services, shuttle services also operate on some interurban lines during off-peak periods. Most Rosewood line services normally operates between Ipswich and Rosewood stations, with connections at Ipswich. The Sunshine Coast line has supplementary Railbus services that operate between Caboolture and Nambour stations.

[edit] Rolling stock

IMU 109 at Bowen Hills station on an interurban service to the Gold Coast

All of Citytrain's rolling stock is electric, air-conditioned, were constructed locally in Maryborough, and are no older than thirty years:

All trains are electric multiple units with a driver cabin at both ends, with the exceptions of EM60 through to EM79 having only one cab at one end. All are configured with three cars, except for the ICE sets that are usually configured with four, five or six cars.

Due to increasing demands, suburban trains may occasionally be used on interurban lines. The Sunshine Coast line frequently suffers the use of the older, though serviceable, EMU sets. The Gold Coast line, predominately serviced by IMU trains, is occasionally serviced by SMU220 trains that have had a software upgrade to allow them to operate at 120 km/h on high-speed parts of the line (identified by the letters "HS" located on the front-left face of the train at either end). While this increases operational flexibility, the trains are not provided with the creature comforts of the IMU or ICE sets, such as toilets or high-backed seats. This predicament will be remedied somewhat with an order of 16 new interurban and 8 new suburban sets being progressively delivered since early 2007. On top of this, and additional 20 three car sets (14 SMU sets and 6 IMU sets), and order for an additional 58 three car sets was made in the Queensland budget for 2008-09.[14]

[edit] Growth and extensions

Citytrain passenger journey growth between the 1997/1998 to 2007/2008 financial years

The Brisbane and south east corner of Queensland has experienced significant population growth, with approximately one million more people living in the area over the last 20 years[15] and a forecast population of more than 3.8 million by 2026.[16] This growth, along with a heightened awareness of the environment and increasing petrol prices, has placed an unprecedented demand on public transport and its infrastructure; Citytrain has reported successive patronage increases of 9% in both the 2005-2006[17] and 2006-2007[8] financial years, and a 6.6% increase in the 2007-2008 financial year[18].

To respond to this demand, the Government of Queensland created the South East Queensland Infrastructure Plan and Program to manage the investment in new transport infrastructure, amongst other areas. QR, in response, created the SEQIPRAIL office to manage and deliver rail components of the plan.

[edit] Increased capacity

[edit] Beenleigh line

A third track was laid between Salisbury and Kuraby stations, a length of 9.5 km (5.9 mi). Previously two tracks, the added capacity allows Gold Coast line services to operate with less chance of delays. Seven railway stations along the section were significantly upgraded. The project was commissioned on 2 March 2008.[19]

[edit] Ferny Grove line

A second track was laid between Mitchelton and Keperra railway station, including an upgrade to the intermediate stations, Oxford Park and Grovely. Upgraded with two platforms, this upgrade allows additional services to operate on the line during peak hour, and will also remove waiting times outbound from Mitchelton and inbound from Keperra. Other improvements include lifts and footbridges, to meet the Disability Standards for Accessible Public Transport, and new, modern station buildings.[20]

[edit] Gold Coast line

The line between Ormeau and Coomera stations, 6.7 km (4.2 mi) in length, was duplicated in October 2006, allowing for additional capacity.[21] Similarly, the 16.6 km (10.3 mi) length between Helensvale and Robina stations is being duplicated, and should remove the need for a four-minute layover at Helensvale for Robina services to wait for the Brisbane service due to the single track either side of the station. It is expected to be completed by July 2008.[22]

[edit] Ipswich line

5.2 km (3.2 mi) of track between Corinda and Darra stations is to be triplicated. Currently four tracks to Corinda then two to Ipswich, the triplication will allow for greater capacity, especially with the proposed Springfield railway line to branch from Darra station. The project is in the design phase, with no construction start date at present. However, the project has been scheduled to be completed no later than late 2016.[23]

[edit] Sunshine Coast line

13.7 km (8.5 mi) of track north of Caboolture station to Beerburrum station is being duplicated and straightened, along with the upgrading of Elimbah and Beerburrum stations. Construction work is underway, and an estimated completion time is early-2009.[24]

From Beerburrum station, 17 km (10.6 mi) of track to Landsborough is proposed to be similarly duplicated and straightened. This project is in the concept stage, with no construction nor completion dates at present.[25]

[edit] New lines

[edit] Gold Coast line

A 4.1 km (2.5 mi) extension of the Gold Coast railway line from Robina to Varsity Lakes is under construction. This is the first stage of the proposed progressive extension of the line to the Gold Coast Airport, with an extension to Elanora completed by 2011, and to Coolangatta by 2026.[26]

[edit] Maroochydore line

The Maroochydore railway line (or CAMCOS, Caloundra and Maroochydore Corridor Options Study), is a proposed single track line due for construction and progressive completion in stages between 2015 and 2020. It will branch from the existing Sunshine Coast line after Beerwah railway station, with completion to Caloundra by 2015, and Maroochydore by 2020.[27]

[edit] Springfield line

The Springfield railway line is a proposed $300 million, 26 km (16.2 mi) extension of the Citytrain network, south-southwest from Brisbane. It is in the preliminary construction phase. The line will branch from the existing Ipswich line after Darra railway station, and extend to the Springfield area. The planned stations are Richlands and Springfield, with Ellen Grove and Springfield Lakes regarded as future stations.[28]

[edit] CBD underground access

On 26 August 2007 the then-Minister for Transport and Main Roads, The Hon Paul Lucas, announced the Inner City Rail Capacity Study to look at underground rail access under the Brisbane central business district. Dismissing a City Loop-style scenario similar to Melbourne, citing the relatively small size of the CBD and "technical and operational constraints", Lucas imagined an underground line from Park Road station to Woolloongabba, then across the Brisbane River to connect with the Exhibition railway line, with major new stations at Woolloongabba, Gardens Point/QUT, and in the CBD. The study will also investigate the feasibility of the Exhibition line operating all year with new stations, and the upgrading of existing lines with additional tracks. Lucas allocated $A5 million to the study and appointed Parsons Brinckerhoff Australia as consultants to "look at options for boosting rail capacity in the city centre, including potential for an underground tunnel".[29]

[edit] References

  1. ^ QR Network Access (22 March 2002). "Brisbane Metropolitan System Information Pack" (PDF). QR Limited. Retrieved on 2008-01-13.
  2. ^ "QR Corporate - QR History - Beginnings". www.corporate.qr.com.au. Retrieved on 2008-08-16.
  3. ^ "QR Corporate - QR History - Building to the bush". www.corporate.qr.com.au. Retrieved on 2008-08-16.
  4. ^ Geoffrey B. Churchman (1995). Railway Electrification in Australia and New Zealand. IPL Books. p. 131. ISBN 0 646 06893 8. 
  5. ^ Geoffrey B. Churchman (1995). Railway Electrification in Australia and New Zealand. IPL Books. p. 132. ISBN 0 646 06893 8. 
  6. ^ "QR Corporate - Modern competitive railway". www.corporate.qr.com.au. Retrieved on 2008-08-16.
  7. ^ Brisbane Rail Electrification Stages 1 and 2 Armstrong, J Australian Railway Historical Society Bulletin, August, 1982 pp165-192
  8. ^ a b c QR Limited. "Meeting Challenges – Annual Report 2006/07" (PDF). QR Limited. Retrieved on 2008-01-13.
  9. ^ http://www.citytrain.com.au/about/fleet/emu/emu.asp
  10. ^ http://www.citytrain.com.au/about/fleet/smui/smui.asp
  11. ^ http://www.citytrain.com.au/about/fleet/smuii/smuii.asp
  12. ^ http://www.citytrain.com.au/about/fleet/imu/imu.asp
  13. ^ QR Limited. "Introducing the Citytrain Fleet" (PDF).
  14. ^ "Transport Priority in State Budget 2008-09" (PDF). SEQIPRail. QLD Tresury Department (3 June 2008). Retrieved on 2008-06-20.
  15. ^ "History of regional planning in South East Qld". Queensland Government Department of Infrastructure and Planning, Office of Urban Management. Retrieved on 2008-01-13.
  16. ^ Office of Economic and Statistical Research. "Queensland Government, Population Projections to 2051: Queensland and Statistical Divisions" (PDF). 2nd edition. Queensland Government. Retrieved on 2008-01-13.
  17. ^ QR Limited. "QR Annual Report 2005/06" (PDF). QR Limited. Retrieved on 2008-01-13.
  18. ^ QR Limited. "QR Annual Report 2007/08" (PDF). QR Limited. Retrieved on 2008-11-11.
  19. ^ "Salisbury to Kuraby Third Track". SEQIPRail. QR Limited (2008-01-11). Retrieved on 2008-01-15.
  20. ^ "Mitchelton to Keperra Duplication". SEQIPRail. QR Limited (30 November 2007). Retrieved on 2008-01-13.
  21. ^ "Ormeau to Coomera Duplication". SEQIPRail. QR Limited (29 November 2007). Retrieved on 2008-01-15.
  22. ^ "Helensvale to Robina Duplication". SEQIPRail. QR Limited (30 November 2007). Retrieved on 2008-01-15.
  23. ^ "Corinda to Darra Third Track". SEQIPRail. QR Limited (2007-11-29). Retrieved on 2008-01-15.
  24. ^ "Caboolture to Beerburrum Duplication". SEQIPRail. QR Limited (2008-01-14). Retrieved on 2008-01-15.
  25. ^ "Beerburrum to Landsborough Track Duplication". SEQIPRail. QR Limited (2007-12-29). Retrieved on 2008-01-15.
  26. ^ "Robina to Varsity Lakes Rail Extension". SEQIPRail. QR Limited (14 January 2008). Retrieved on 2008-01-13.
  27. ^ "Caloundra South CAMCOS Realignment study". Queensland Government. Retrieved on 2007-08-19.
  28. ^ "SEQIPRAIL - Darra to Springfield Transport Corridor - Overview". SEQIPRail. QR Limited (2007-11-10). Retrieved on 2008-01-13.
  29. ^ Government of Queensland (26 August 2007). Future rail connection in study's sights. Press release. http://www.cabinet.qld.gov.au/MMS/StatementDisplaySingle.aspx?id=53666. Retrieved on 2008-01-15. 

[edit] External links

Personal tools
Languages