Service difficulties
and emergency
service: 13 20 90
The e-Developer procedures must be followed by suppliers in the definition, design and construction of water and wastewater infrastructure. They should be read in conjunction with the relevant Water Services Association of Australia codes of practice and associated Sydney Water supplements or the Sydney Water Editions of the WSAA Codes.
Constructors (Major Works) (PDF - 120KB)
Constructors Minor Works (Wastewater) (PDF - 91KB)
Designers (PDF - 70KB)
Field Testers (PDF - 39KB)
Service Protection Report (PDF - 679KB)
Under Pressure Cut-In Connection (UPCIC) Constructors (PDF - 42KB)
Water Service Connections (Drillers) (PDF - 191KB)
Water Servicing Coordinators (Major Works) (PDF - 176KB)
Water Servicing Coordinators Minor Works (Wastewater) (PDF - 151KB)
Supplementary Information
Asset Creation Developer Process Overview (PDF - 114KB)
Fitness & Aptitude For Working In Confined Spaces (PDF - 109KB)
Generic Asset Hazards - At Point Of Connection (PDF - 22KB)
Pipe Sizing and Grading Tables (PDF - 156KB)
Risk Assessment In Design (PDF - 298KB)
Safe Entry & Working in Confined Spaces (PDF - 996KB)