Service difficulties
and emergency
service: 13 20 90

Printer friendly versionShrink textEnlarge text

Project documentation

The following documents are available online and/or for members of the public to view at the Sydney Water library in Bathurst Street, Sydney. If you are interested in viewing the documents, please call the desalination project team on free call 1800 685 833.

All the documents linked to this page are in sequential order, ie. they effectively reflect the progress of Sydney's Desalination project from start to finish, from a regulatory point of view.

Project approvals

As required by the NSW Minister for Planning as part of the planning approvals for the Sydney Desalination Project, below are the relevant Environmental assessments, determinations, current approvals, licences and permits.


Desalination Plant (including the seawater intake and outlet)
2005 PDF Major project application (PDF - 2.31MB)
2005 PDF Record of linear infrastructure designation under clause 8F(4) of the Environmental Planning and Assessment Regulation 2000 (PDF - 30KB)
2005 PDF Critical infrastructure declaration (PDF - 28KB)
2005 PDF Concept plan authorisation (PDF - 25KB)
2005 PDF/Library Environmental Assessment (PDF - 36.6MB)
2006 PDF/Library Preferred Project Report (PDF - 4.51MB)
2006 PDF Independent panel report (PDF - 2.53MB)
2006 PDF Director General's report (PDF - 626KB)
2006 PDF/Library Concept approval (PDF - 328KB)
2006 PDF/Library Project approval desalination plant (PDF - 458KB)
2006 PDF/Library Project approval seawater intake discharge (PDF - 416KB)
2007 PDF NSW Maritime approval for the temporary load-jetty at Port Botany Yard (PDF - 1.54MB)
2008 PDF NSW Maritime Certificate of Survey for Sea Fox 6 (PDF - 1.68MB)
2008 PDF Environment Protection Licence (PDF - 228KB)  

Pipeline (including drinking water pumping station)
2007 PDF/Library Environmental Assessment (PDF - 12.81MB)
2007 PDF/Library Preferred Project Report (PDF - 3.18MB)
2007 PDF/Library Project approval (PDF - 604KB)
2007 PDF Director General's Report (PDF - 1.33MB)
2008 Library Application for Modification of Project Approval - Urban Sydney Sector North
2008 PDF Modification of approval - Urban Sydney Sector North (PDF - 143KB)
2008 PDF/Library NSW Maritime Construction Consent (Silver Beach construction area) (PDF - 3.17MB)
2008 PDF/Library NSW Maritime Construction Consent (Kyeemagh construction area) (PDF - 8.92MB)
2008 PDF Environment Protection Licence (PDF - 224KB)
2008 Library Application for Modification of Project Approval - Botany Bay Sector
2008 PDF Modification of approval - Botany Bay Sector (PDF - 1.3MB)
2008 PDF Works Permit - Airports (Building Control) Regulations (PDF - 136KB)
2008 PDF Airport Lease company Consent (SACL) (PDF - 7.81MB)
2008 PDF NSW Maritime approval - Clause 66 (PDF - 274KB)
2008 Library Application for Modification of Project Approval - Botany Bay Sector
2009 PDF Modification of approval - Botany Bay (PDF - 448KB)  
2009 PDF/Library NSW Maritime approval - Section 13T (PDF - 5197KB)  
2009 PDF/Library Sydney Ports Corporation Harbour Master section 67 approval (PDF - 60KB)
2009 PDF/Library SACL consent for construction of water pipeline through HIAL 'Area B' (PDF - 8.11MB)
2009 PDF/Library Amended works permit - Airports (Building Control) Regulations (PDF - 0.14MB)

Compliance tracking program

Under the Conditions of Approval for the desalination project, Sydney Water is required to develop a compliance tracking program for reporting to the Director General of the NSW Department of Planning on an annual basis.


2007 Library Compliance tracking program
2008 PDF Outcomes of Compliance Tracking for year 2007 -2008 (PDF - 39KB)

Environmental management plans

Environmental management plans have been prepared as required by the Minister's Conditions of Approval prior to construction starting. The following plans are in the Sydney Water library.


Desalination plant (including the seawater intake and outlet)
2006 Library Marine and Estuarine Monitoring Program
2007 Library Conservation Area Management Plan
2007 Library Spoil Management and Disposal Strategy & Spoil Management Plan
2007 Library Traffic Management Protocol and Traffic Management Plan
2007 Library Biodiversity Protection Plan
2007 Library Construction Noise Management Plan
2007 Library Construction Soil and Water Management Plan
2007 Library Acid Sulphate Soil and Contamination Management Plan

Pipeline (including drinking water pumping station)
2008 Library Biodiversity Protection Plan, for the drinking water pumping station
2008 Library Construction Water Management Plan, Botany Bay Sector
2008 Library Beach and Foreshore Monitoring, Program Botany Bay Sector
2008 Library Ecosystem Monitoring Program, Botany Bay Sector
2008 Library Acid Sulphate Soils and Contamination Management Plan
2008 Library Construction, Noise and Vibration Management Plan
2008 Library Construction Traffic Management Protocol
2008 Library Erosion, Sedimentation and Groundwater Management Protocol (including surface water management)
2008 Library Spoil Management Plan (including spoil management and disposal strategy)

Desalination plant contract

The Blue Water Joint Venture, consisting of John Holland and Veolia Water, is designing and building the plant and Veolia Water will operate and maintain the plant. Sydney Water will own the plant. The documents below include amendments made to one of the contracts (the Design and Construct Contract) in October 2008.


These documents do not disclose commercial-in-confidence information, in line with Section 15A of the Freedom of Information Act. Sydney Water and other state-owned corporations are exempt from these public disclosure requirements. However, the documents are being made available as part of Sydney Water's commitment to transparency.


2007 PDF Contracts Summary (PDF - 5.91MB)
2007 PDF Volume 1 - Design and construct contract (PDF - 3.77MB)
2007 PDF Volume 2 - Design and construct contract: Schedule 14 - Company's requirements (PDF - 3.68MB)
2007 PDF Volume 3 – Refer to contract summary
2007 PDF Volume 4 - Operate & maintain contract (PDF - 8.06MB)
2007 PDF Volume 5 - Operate & maintain contract: Exhibit A - Company's requirements (PDF - 4.4MB)
2007 PDF Volume 6 - Other project documents (PDF - 4.01MB)
2008 PDF Design & Construct Contract Amending Deed - 22 October 2008 (PDF - 265KB)

Pipeline - Project alliance agreement

The pipeline will be built by the Water Delivery Alliance, which includes Sydney Water, Bovis Lend Lease, McConnell Dowell, Kellogg Brown & Root, WorleyParsons and Environmental Resources Management. Sydney Water will own the pipeline.


These documents do not disclose commercial-in-confidence information, in line with Section 15A of the Freedom of Information Act. Sydney Water and other state-owned corporations are exempt from these public disclosure requirements. However, the documents are being made available as part of Sydney Water's commitment to transparency.


2008 PDF An Introduction to the Desalination pipeline Project Alliance Agreement (PDF - 5.01MB)
2008 PDF Water delivery alliance - Project Alliance Agreement for Amending deed 1 (Redacted) (PDF - 2.71MB)

Desalination Renewable Energy Contracts

The desalination plant will be powered by 100% renewable energy. Sydney Water has signed 20 year energy supply contracts with Renewable Power Ventures and Babcock & Brown Power.


These documents do not disclose commercial-in-confidence information, in line with Section 15A of the Freedom of Information Act. Sydney Water and other state-owned corporations are exempt from these public disclosure requirements. However, the documents are being made available as part of Sydney Water's commitment to transparency.

2008 PDF Project Deed (PDF - 422KB)
2008 PDF Renewable Energy Certificate Supply Agreement (PDF - 533KB)
2008 PDF Electricity Supply Agreement (PDF - 558KB)
2008 PDF Contracts introduction and summary (PDF - 1.6MB)