Suvarnabhumi Airport

From Wikipedia, the free encyclopedia

Jump to: navigation, search
Suvarnabhumi Airport
ท่าอากาศยานสุวรรณภูมิ
(Sanskrit: Suwarṇa - Gold, Bhūmi - Land)

IATA: BKKICAO: VTBS
Summary
Airport type Public
Operator Airports of Thailand
Serves Bangkok, Thailand
Elevation AMSL 5 ft / 2 m
Coordinates 13°40′52″N 100°44′50″E / 13.68111, 100.74722
Website http://www.airportthai.co.th
Runways
Direction Length Surface
m ft
01R/19L 4,000 13,123 Asphalt
01L/19R 3,700 12,139 Asphalt
Source: DAFIF[1][2]
Terminal interior
Terminal interior
Thai Airways plane at the airport
Thai Airways plane at the airport

Suvarnabhumi Airport (Thai: ท่าอากาศยานสุวรรณภูมิ; pronounced /sùwannápʰūːm/) (IATA: BKKICAO: VTBS), also known as (New) Bangkok International Airport, is the international airport serving Bangkok, Thailand. After delays and three decades of planning, the airport opened for limited domestic flight service on September 15, 2006, and opened for all domestic and international commercial flights on September 28. [3]

The airport is the main hub for Thai Airways International, Bangkok Airways, Orient Thai Airlines, PBair and Thai AirAsia, and a focus city for China Airlines, Cathay Pacific, Emirates Airline, EVA Air, Indian Airlines, and SriLankan Airlines.

The airport is located in Racha Thewa in Bang Phli district, Samut Prakan Province, about 25 km east of downtown Bangkok. The name Suvarnabhumi was chosen by King Bhumibol Adulyadej and refers to the golden kingdom hypothesized to have been located somewhere in Southeast Asia. Designed by Helmut Jahn of Murphy/Jahn Architects, this airport has the world's tallest control tower (132.2 m), and the world's third largest single-building airport terminal (563,000 m²), a little smaller than Hong Kong International Airport (570,000 m²) and the current record holder, Beijing Capital International Airport's Terminal Three (986,000 m²). Suvarnabhumi is one of the busiest airports in Asia and Bangkok's primary airport for all international airline flights.[4] The airport inherited the airport code BKK from Don Mueang after the older airport ceased commercial flights.

Months into its opening, issues such as congestion, construction quality, signage, provision of facilities, and soil subsidence continued to plague the project, prompting calls to reopen Don Mueang to allow for repairs to be done.[5] Expert opinions varied widely regarding the extent of Suvarnabhumi's problems as well as their root cause; most airlines stated that damage to the airport was minimal.[6][7] Prime Minister Surayud Chulanont decided on 16 February 2007 to reopen Don Mueang for domestic flights on a voluntary basis, with 71 weekly flights moved back initially, with no international flights allowed.[8]

A modern motorway connects the airport, Bangkok, and the heavily industrial Eastern Seaboard of Thailand, where most of the manufacturing for export takes place.

Contents

[edit] History

Suvarnabhumi Airport layout
Suvarnabhumi Airport layout
Border between the councourse and the terminal seen from the arrival area
Border between the councourse and the terminal seen from the arrival area
Suvarnabhumi Airport terminal
Suvarnabhumi Airport terminal
Suvarnabhumi Airport terminal
Suvarnabhumi Airport terminal

[edit] Land purchase, early construction

The plot of land occupied by the airport with an area of 8,000 acres (32 km²) was purchased in 1973 but the student uprising on October 14 of the same year was followed by the overthrow of the military government of Thanom Kittikachorn and the project was shelved.[9] After a series of ups and downs, the "New Bangkok International Airport" company (NBIA) was formed in 1996. Due to political and economic instabilities, notably the Asian financial crisis of 1997, the civil construction began six years later in January 2002 during the government of Thaksin Shinawatra. The airport is located in a once low-lying marsh, formerly known as Nong Ngu Hao (Thai: หนองงูเห่า, lit. "Cobra Swamp"), which took 5 years (1997 - 2001) to clear through land reclamation. In 2005, the construction supervision and management was transferred to the Airports of Thailand PLC, while the NBIA company was dissolved.

[edit] Financing

30% of the airport's construction cost was covered by Airports of Thailand, while another 70% came from the Japan Bank for International Cooperation (JBIC). Airport-related procurement followed JBIC's stringent guidelines for transparency and openness. Despite populism regarding the airport as being built for passengers, Japanese and Thai exporting companies in the area for a long time wanted a round the clock airport built along with a modern motorway between factories, Bangkok, and the port of Laem Chabang.

[edit] Early construction, airport tests, and official opening

The airport was due to open in late 2005, but a series of budget overruns, construction flaws, and allegations of corruption plagued the project.

A further problem was the belief that the airport was haunted by spirits, and sightings of ghosts by superstitious construction workers, so that on September 23, 2005, the Thai airports authority held a ceremony with 99 buddhist monks chanting prayers to calm these spirits. IANS article about the haunting

Symbolic first test flights involving two Thai Airways aircraft were held on 29 September 2005, a previously announced deadline for opening.

Full tests of the airport, with seats sold to the public, took place on July 3 and July 29, 2006. Six airlines – Thai Airways International, Nok Air, Thai Air Asia, Bangkok Airways, PBair and One-Two-GO – used the airport as a base for 20 domestic flights.[10][11] The first international test flights were conducted on September 1, 2006. Two THAI's aircraft, B747-400 and A300-600, simultaneously departed the airport on 9.19am to Singapore and Hong Kong. At 3.50pm the same aircraft flew back and made simultaneous touchdowns on runways 19L and 19R. These test flights demonstrated the readiness of the airport to handle heavy traffic.

On 15 September 2006, the airport started limited daily operations with Jetstar Asia Airways operating three flights daily to Singapore and Thai Airways International operating some domestic flights to Phitsanulok, Chiang Mai and Ubon Ratchathani. Bangkok Airways moved on 21 September, AirAsia and Thai AirAsia followed suit on 25 September and on 26 September Nok Air moved to Suvarnabhumi Airport. During this initial phase, as well as in the previous tests, the airport used the temporary IATA code NBK.

Suvarnabhumi officially opened at 3:00am on September 28, 2006, taking over all flights from Don Mueang. The first flight to arrive was Lufthansa Cargo flight LH8442 from Mumbai at 3:05am.[12] The first commercial arrival was from Japan Airlines at 3:30am. The first passenger arrival was Aerosvit flight VV171 from Kiev at 4:30am, and the first cargo departure was Saudi Arabian Airlines flight SV-984 to Riyadh at 5:00am.[13] Aerosvit also had the first passenger departure (VV172 to Kiev) around 5:30am.[14]

[edit] Initial difficulties

Many difficulties were recorded in the first few days of the airport's operation. On the first day alone, sluggish luggage claims were common - the very first passenger arrival by Aerosvit took an hour for the luggage to start coming out, and some flights did not have their luggage coming out even after four hours. Also flights were delayed (Thai Airways claimed that 17 of 19 flights were delayed that day), and there were also failures with the check-in system.[15][16] Subsequent problems included the failure of the cargo computer system, and the departure boards displaying the wrong information, resulting in confused passengers (especially as unlike Don Muang, there were no "final calls" issued).[17]

[edit] Capacity and safety issues

[edit] Problems with the tarmac

The Engineering Institute of Thailand conducted investigations at the airport in late 2006 after signs of distress were spotted at several locations in Suvarnabhumi's taxiways and taxilanes. Rutting was found in five of the six taxilanes and one of the six taxiways. Plastic deformation of the asphalt wearing course was observed near the takeoff position of the runway. However, the investigators noted that plastic deformation at this location was a common phenomenon and only routine maintenance was required to repair the distress. Aside from this surface distortion, both runways were in good structural condition.

Further investigations found that that taxilane and taxiway rutting was caused by separation of the asphalt binder from the aggregate surface due to prolonged water infiltration into the asphalt concrete base course, a phenomenon known as "stripping." The 23 cm thick base course is the top-most layer of the tarmac. Core samples indicated that the concrete base course material contained the correct job mix and aggregate gradation. Below the base course are the binder course, the wearing course, and the cement-treated base.

Detailed investigations found that water seepage was evident along the rims of the expansion joints in the cement-tested base, indicating that a large quantity of water was still trapped in the sand blanket (the bottom-most layer of the tarmac). It was found that water trapped in the sand blanket was fully confined with no connection to the pavement areas of the airport. A later investigation by the AoT identified several potential reasons for the trapped water in the sand blanket. The AoT's findings were disputed by several experts.

The Engineering Institute of Thailand sent a formal warning to the AoT in November 2006 about the urgent need to drain water from beneath the tarmac, and the need for immediate action. "The AOT did nothing about the problem," Suebsak Promboon of the EIT later noted. "The situation might not have become this bad if the water had been drained then."

In January 2007, ruts were discovered in the runways at Suvarnabhumi.[18] The east runway was scheduled to close for repairs. Expert opinions have varied widely as to the root cause of the ruts.[19] Airport authorities and airline representatives maintained that the airport was still safe and resisted suggestions that the airport should be completely closed and all flights moved back to Don Muang.[20]

On 27 January 2007, however, the Department of Civil Aviation declined to renew the airport's safety certificate, which expired the previous day. The ICAO requires that international airports hold aerodrome safety certificates, but Suvarnabhumi will continue to operate because the ICAO requirement has yet to be adopted as part of Thai law.[21]

A junta-appointed panel of engineers assigned to inspect the airport noted that damage to the airport was "minute," and "common." According to a panel member, the problem with the runways and taxiways are ruts, not cracks in the asphalt as had previously been claimed. "This is a common type of damage. You see it in airports all over the United States," said Noppodol Phien-Wej, a panel-member. A spokesman for British Airways, also said that "everything is normal," and that "we haven't heard any complaints from the staff."[22]

A two-week investigation led by Tortrakul Yomnak, a chief engineer for Airports of Thailand and a leader of the anti-Thaksin movement, later found that the runway was safe, and that cracks could be repaired in as little as a few hours. At the beginning of the investigation, Tortrakul had warned that the airport might need to be closed for three years.[23][24]

In a public statement on 15 February 2007, the EIT again strongly recommended that trapped water should be drained out immediately to minimise the potential spread of cracks. Karun Chandrarangsu, president of the Engineering Institute of Thailand noted, "Suvarnabhumi is like a patient in a coma who continues to suffer from severe bleeding. Stopping the blood flow now is more urgent and important than debating what caused the injury."[25][26]

The military junta used allegedly shoddy construction at the airport as one of the justifications its overthrow of the Thaksin-government, and it later purged the top management of AoT.[27][28][29] Critics noted that junta-led investigations were unlikely to reveal an impartial picture of the airport's shortcomings. "Problems are normal for any new airport. In our case it's made more complex because everybody wants to run down the former prime minister," noted Sumet Jumsai, a leading Thai architect.[30]

[edit] Capacity

[citation needed]

The airport has 2 parallel runways (60 m. wide, 4,000 m. and 3700 m. long) and 2 parallel taxiways to accommodate simultaneous departures and arrivals. It has a total of 120 parking bays (51 with contact gates and 69 remote gates) and 5 of these are capable of accommodating the Airbus A380 aircraft. With a capacity of handling 76 flight operations per hour, both international and domestic flights will share the airport terminal but will be assigned to different parts of the concourse. In the initial phase of construction, it will be capable of handling 45 million passengers and 3 million tonnes of cargo per year. Between the airport hotel and the terminal building are the two 5-storey car park buildings with a combined capacity of 5,000 cars.

[edit] Plans to re-open Don Muang for domestic

In January 2007, Thai Airways announced a plan to move some of its domestic operations back to Don Muang International Airport due to overcrowding. Three days later, the Ministry of Transport recommended temporarily reopening Don Muang while repair work on the runways at Suvarnabhumi proceeds. The recommendation is still subject to approval by the junta's Cabinet. Thai Airways said it would shift most of its domestic flights back, keeping flights with high international passenger connections such as Chiang Mai and Phuket at Suvarnabhumi. Bangkok Airways and One-Two-GO have similar plans. Thai AirAsia said it would not move unless it could shift both its international and domestic operations. Nok Air and PBair were undecided.[31][32]

[edit] Repair and upgrades

Airports of Thailand found that the cost of fixing 60 identified problems at the airport would be less than 1% of the total airline cost and the problems could be fixed in up to four to five years. Dr. Narupol Chaiyut, a member of a committee overseeing service problems at the new airport, estimated that 70% of the problems would be fixed within 2007. 20 of the 60 problems were successfully fixed by February 2007.[33]

[edit] Incidents

On 25 January 2007, due to work to repair the cracks in the taxiways, incoming flights were delayed and several flights were diverted to U-Tapao International Airport .[34]

[edit] Specifications

Phase two of the airport
Phase two of the airport

Costing an estimated ฿155 billion (US$3.8 billion), the airport has 2 parallel runways (60 m wide, 4000 m and 3700 m long) and two parallel taxiways to accommodate simultaneous departures and arrivals.[35] It has a total of 120 parking bays (51 with contact gates and 69 remote gates), with five of these capable of accommodating the Airbus A380. The main passenger terminal building, with a capacity of handling 76 flight operations per hour, co-locates the international and domestic terminals, though assigning them to different parts of the concourse. In the initial phase of construction, it will be capable of handling 45 million passengers and 3 million tonnes of cargo per year. Above the future underground rail link station and in front of the passenger terminal building is a 600-room hotel operated by Accor Group under the Novotel brand. Between the airport hotel and the terminal building are the two 5-storey car parks with a combined capacity of 5,000 cars.

Long-term plans for four runways flanking two main terminals, two satellite buildings and a low-cost terminal will have a combined capacity capable of handling up to 120 million passengers and 6.4 million tonnes of cargo a year are on the drawing board. The second phase of airport expansion involving the construction of a satellite building south of the main terminal is expected to begin 3 to 5 years after the completion of the first main terminal.

Airports of Thailand PLC (AOT), the owner and operator of Suvarnabhumi Airport, announced on 21 July 2006 that a separate terminal for Low-cost carriers will be built at the airport at a cost of 600 million baht (15.8 million dollars). The budget terminal will be located near Concourse A of the main terminal. It is capable of handling 15 million passengers per year. Its operating concept will be modeled after the LCC terminals of Kuala Lumpur International Airport and Singapore Changi Airport. However, as Don Mueang has been reopened and is also being used by some low-cost domestic airlines, the necessity of a new terminal is unclear and no construction work has started.

Despite claims from the owner of the airport that the new passenger terminal building is the world's largest at 563,000 m², Hong Kong International Airport still stays number one with 570,000 m², as the airport completed expanding the existing terminal in 2004 from 550,000 m² to make room for the greatly expanded shopping mall, SkyMart, at the East Hall area. This was before Beijing Capital International Airport opened Terminal 3 in 2008, with an area of 986,000 m². The control tower, however, is the tallest in the world at 132.2 m (about 433 feet), topping Kuala Lumpur's by about 2 meters.

[edit] Jetways, Airlines and destinations

Bangkok Suvarnabhumi International Airport has 51 air bridges.

Airlines that operates flights in and out of Suvarnabhumi Airport
Airlines Destinations
Aeroflot Moscow-Sheremetyevo
Aerosvit Airlines Kiev-Boryspil
Air Arabia Kathmandu [starting soon]
AirAsia Kuala Lumpur, Johor Bahru
  • Hanoi, Ho Chi Minh City, Hong Kong, Jakarta, Kuala Lumpur, Macau, Penang, Phnom Penh, Shenzhen, Singapore, Xiamen, Yangon
  • Jakarta
Air Astana Almaty
Air Austral Saint Denis de la Reunion
Air Bagan Yangon
Air China Beijing, Chongqing, Chengdu
Air France Hanoi, Ho Chi Minh City, Paris-Charles de Gaulle
Air India
  • Kolkata
  • Chennai, Delhi, Gaya, Guwahati, Kuala Lumpur, Mumbai
Air Koryo Pyongyang
Air Macau Macau
Air Madagascar Antananarivo
All Nippon Airways Tokyo-Narita
Asiana Airlines Seoul-Incheon
Austrian Airlines Vienna
Bangkok Airways Fukuoka, Guilin, Hiroshima, Ho Chi Minh City, Jinghong, Luang Prabang, Macau, Malé, Pakse, Phnom Penh, Shenzhen, Siem Reap, Sihanoukville, Xian, Yangon
Biman Bangladesh Airlines Dhaka, Singapore
Best Air Dhaka
Blue Panorama Airlines Milan-Malpensa
British Airways London-Heathrow, Sydney
Cathay Pacific Colombo, Dubai, Hong Kong, Karachi, Mumbai, Singapore
Cebu Pacific Manila, Manila-Clark [begins November 8][36]
China Airlines Amsterdam, Hong Kong, Kaoshiung, Rome-Fiumicino, Taipei-Taiwan Taoyuan
China Eastern Airlines Kunming, Shanghai-Pudong
China Southern Airlines Guangzhou, Shantou
Condor Airlines Frankfurt, Munich
Drukair Paro, Dhaka, Kolkata, Gaya
EgyptAir Beijing, Cairo, Guangzhou
El Al Israel Airlines Tel Aviv
Emirates Airline Auckland [ends 31 January 2009], Christchurch [starts 01 February 2009], Dubai, Hong Kong, Sydney
Ethiopian Airlines Addis Ababa, Guangzhou, Hong Kong
Etihad Airways Abu Dhabi
EVA Air Amsterdam, London-Heathrow, Taipei-Taiwan Taoyuan, Vienna
Finnair Helsinki
Garuda Indonesia Jakarta
GMG Airlines Chittagong, Dhaka
Gulf Air Bahrain
Hainan Airlines Haikou, Nanning
Hong Kong Express Airways Hong Kong
Indonesia AirAsia Jakarta
Iran Air Tehran-Imam Khomeini
Israir Airlines Tel Aviv
Japan Airlines Nagoya-Centrair, Osaka-Kansai, Tokyo-Narita
Jet Airways Delhi, Kolkata, Mumbai
Jetstar Asia Airways Singapore
Kenya Airways Guangzhou, Hong Kong, Nairobi
KLM Amsterdam, Taipei-Taiwan Taoyuan
Korean Air Busan, Daegu, Seoul-Incheon
Kuwait Airways Kuwait, Manila
KrasAir Krasnoyarsk
Lao Airlines Luang Prabang, Vientiane
LTU International Berlin-Tegel, Düsseldorf, Munich
Lufthansa Frankfurt, Ho Chi Minh City, Kuala Lumpur
Mahan Air Tehran-Imam Khomeini
Malaysia Airlines Kuala Lumpur
Malév Hungarian Airlines Budapest [seasonal, until 26 October 2008]
Mihin Lanka Colombo
Myanmar Airways International Yangon
Nok Air Hanoi
Northwest Airlines Honolulu, Tokyo-Narita
Oman Air Muscat
Orient Thai Airlines Hong Kong, Kathmandu, Seoul-Incheon
Pacific Airlines Ho Chi Minh City
Pakistan International Airlines Hong Kong, Islamabad, Lahore
PBair Da Nang
Philippine Airlines Manila
PMTair Phnom Penh
President Airlines Phnom Penh
Qantas London-Heathrow, Sydney
  • Melbourne
Qatar Airways Doha
Royal Brunei Airlines Bandar Seri Begawan
Royal Jordanian Amman, Hong Kong
Nepal Airlines Kathmandu
Royal Phnom Penh Airways Phnom Penh
S7 Airlines Irkutsk, Moscow-Domodedovo, Novosibirsk, Tianjin
Saudi Arabian Airlines Jeddah, Riyadh
Scandinavian Airlines System Copenhagen, Stockholm-Arlanda
Shanghai Airlines Chongqing, Shanghai-Pudong
Siem Reap Airways Siem Reap
Singapore Airlines Singapore, Tokyo-Narita
SkyStar Airways Seoul-Incheon
SriLankan Airlines Beijing, Colombo, Hong Kong
Swiss International Air Lines Singapore, Zürich
Thai Airways International Athens, Auckland, Bangalore, Beijing, Brisbane, Busan, Chengdu, Chennai, Chittagong, Colombo, Copenhagen, Delhi, Denpasar/Bali, Dhaka, Dubai, Frankfurt, Fukuoka, Gaya, Guangzhou, Hanoi, Ho Chi Minh City, Hong Kong, Hyderabad, Islamabad, Jakarta, Johannesburg, Kathmandu, Karachi, Kolkata, Kuala Lumpur, Kunming, Kuwait, Lahore, London-Heathrow, Los Angeles, Madrid, Manila, Melbourne, Milan-Malpensa, Moscow-Domodedovo, Mumbai, Munich, Muscat, Nagoya-Centrair, Osaka-Kansai, Paris-Charles de Gaulle, Penang, Perth, Phnom Penh, Rome-Fiumicino, Seoul-Incheon, Shanghai-Pudong, Singapore, Stockholm-Arlanda, Sydney, Taipei-Taiwan Taoyuan, Tokyo-Narita, Varanasi, Vientianne, Xiamen, Yangon, Zürich
Tiger Airways Singapore
Transaero Moscow-Domodedovo, Saint Petersburg
Turkish Airlines Istanbul-Atatürk
Turkmenistan Airlines Ashgabat
Uni Air Kaohsiung
United Airlines San Francisco, Tokyo-Narita
Ural Airlines Yekaterinburg
Uzbekistan Airways Tashkent
Vietnam Airlines Hanoi, Ho Chi Minh City
Vladivostok Air Seoul-Incheon, Vladivostok
Xiamen Airlines Xiamen
Chartered airlines that operates flights in and out of Suvarnabhumi International Airport
Airlines Destinations
Air Finland Helsinki
Air Italy Polska Warsaw [Seasonal]
Dalavia Khabarovsk
Finnair Oulu
Thomas Cook Airlines Scandinavia Göteborg-Landvetter, Oslo
Travel Service Prague
TUIfly Nordic Copenhagen, Göteborg-Landvetter, Oslo, Stockholm-Arlanda
Domestic airlines that operates flights in and out of Suvarnabhumi International Airport
Airlines Destinations
Bangkok Airways Chiang Mai, Koh Samui, Krabi, Phuket, Sukhothai, Trat, U Taphao-Rayong
PBair Buriram, Lampang, Mae Hong Son, Nakhon Phanom, Nan, Roi Et, Sakon Nakhon
SGA Airlines Hua Hin
Thai AirAsia Chiang Mai, Chiang Rai, Hat Yai, Krabi, Narathiwat, Phuket, Ranong[38], Surat Thani, Ubon Ratchathani, Udon Thani
Thai Airways International Chiang Mai, Chiang Rai, Koh Samui, Krabi, Phuket
Cargo airlines that operates flights in and out of Suvarnabhumi International Airport
Airlines
Air France Cargo
Air Hong Kong
ANA Cargo
Asiana Cargo
Cathay Pacific Cargo
Cargolux
China Airlines Cargo
DHL
Emirates SkyCargo
Euro Air Cargo [planned] [2]]]
EVA Air Cargo
FedEx
Japan Airlines Cargo
KLM Cargo
Korean Air Cargo
Kuzu Airlines Cargo
Lufthansa Cargo
Malaysia Airlines Kargo
Martinair Cargo
Nippon Cargo Airlines
Shanghai Airlines Cargo
Singapore Airlines Cargo
United Parcel Service

[edit] Ground transportation

Departure drop off
Departure drop off
Taxis stand is located outside the arrival hall on the same level
Taxis stand is located outside the arrival hall on the same level
City Air Terminal (CAT); Main downtown terminal of Suvarnabhumi Airport Link System
City Air Terminal (CAT); Main downtown terminal of Suvarnabhumi Airport Link System
City Line train
City Line train

[edit] Suvarnabhumi Airport Express

The construction of the City Airport Terminal in Makkasan and a 28.6 km high-speed rail link to the new airport started in July 2005 and are planned for completion in May 2009, after multiple delays. The airport express, informally known as the Pink Line and operated jointly with SRT's planned Red Line commuter service, will connect with the BTS Sukhumvit Line (Green Line, Route 1) and MRT Blue Line at Phaya Thai and Phetchaburi stations respectively, offering airport-bound passengers a fast 15-minute limited stop journey from the city.

[edit] Train

Meanwhile, SRT provides a suburban commuter train service between Hua Takhe (the nearest station to Suvarnabhumi on the East line) and the northern suburban city of Rangsit via downtown Bangkok and the old Don Mueang Airport. The train also connects with BTS and MRT at Phaya Thai and Phetchaburi stations respectively. Passengers pay a flat fare of Bt30. A shuttle bus service linking the airport with Hua Takhe railway station is provided by BMTA for Bt15. The train service is currently not as popular as the bus service because the fact that it requires a shuttle bus connection. The service will be stopped when the Airport Express Link is completed.

[edit] CityBus

The airport operates 4 airport express bus routes to downtown Bangkok. The buses are air-conditioned with ample luggage space. The fare is 150 baht for the entire route. Passengers can get on the bus on the first floor of the terminal. The four routes are as follows:

Service Destination Notes
Airport Express bus
AE1 Suvarnabhumi Silom Road by expressway
AE2 Suvarnabhumi Khao San Rd. by expressway
AE3 Suvarnabhumi CentralWorld via Sukhumvit Rd.
AE4 Suvarnabhumi Hua Lamphong (central Bangkok Railway Station) via Victory Monument(by expressway)

Additionally, 12 city bus routes operated by Bangkok Mass Transit Authority (BMTA) serve the airport's dedicated bus terminal. City buses offer a cheaper alternative of Bt35 flat fare, compared with the airport express bus. However, passengers must take a shuttle bus to the public transportation center's bus terminal before they can board the regular city buses. The 12 routes available are as follows:

Service Destination Notes
City Bus
549 Suvarnabhumi Minburi-Bangkapi via Seri Thai Rd.
550 Suvarnabhumi Happy Land
551 Suvarnabhumi Victory Monument by expressway
552 Suvarnabhumi Khlong Toei (Customs Dept.) via Onnut BTS station
552A Suvarnabhumi Samut Prakarn (Praeksa Garage)
553 Suvarnabhumi Samut Prakarn (Crocodile Farm Garage)
554 Suvarnabhumi Rangsit via Don Mueang and Ram Indra Rd. by expressway
555 Suvarnabhumi Rangsit via Don Mueang and Central Plaza LadPhrao by expressway
556 Suvarnabhumi Southern Bus Terminal via Ratchadamnoen Klang Rd. and Democracy Monument by expressway
557 Suvarnabhumi Wong Wian Yai (The Great Circle) Out of Service
558 Suvarnabhumi Central Plaza Rama II
559 Suvarnabhumi Future Park Rangsit via Dream World by expressway
Service Destination Notes
Long-distance services
Transport Company Bus Pattaya
Transport Company Bus Nong Khai

All of the city buses and inter-city buses are air-conditioned.

[edit] Taxi

Metered taxis are available on the same level as the arrival hall. There is a 50 baht surcharge on the meter. The trips to the city will cost 200 – 400 baht (plus highway tolls of 65 baht) and will take about 30 – 40 min. depending on traffic.

[edit] Car

The airport has 5 main access routes. Among these the most convenient route is via the Bangkok Chon Buri Motorway (Highway No. 7). Another main airport entrance is in Samut Prakan province via the expressway from Bang Na to Bang Pakong.

[edit] Limousines

Additionally, flat-fare limousines are available at the Arrivals Level (2nd floor). Limousine services are provided by Airports of Thailand (AOT). The Thai Royal First service is discontinued.

[edit] Airport Link (Under Construction)

The standard gauge line, forming the eastern section of the Light Red line, will be 28.6 km long and is elevated for most its length, running above existing railway right-of-way, with a short at-grade connection to the airport. Both non-stop Suvarnabhumi Airport Express services and "stopping" Suvarnabhumi Airport City Line commuter services will be operated, with Express journeys taking 15 minutes and Commuter trips 27 minutes[37].

Siemens is supplying nine Desiro class 360/2 trainsets based on the vehicles built for Heathrow Connect services in London. City services will be worked by five three-car trains, and the Express services by four trainsets with a fourth car for checked baggage. The first trains left Germany in September 2007, and testing in Bangkok was to begin in March 2008.[38]

The line will be electrified at 25 kV AC. All stations are being built for 10-car trains, and fitted with platform screen doors. Top speed will be 160 km/h, but the short distances mean that City services will not actually reach that speed.[39]

Code Station Name Express Train City Train Transfer
Suvarnabhumi Airport Rail Link
1 Suvarnabhumi Airport X X
2 Lad Krabang | X
3 Ban Thapchang | X
4 Hua Mark | X
5 Ramkhamhaeng | X
6 Makkasan (City Air Terminal) X X Image:AB-Kreuz.svg MRT Blue Line (Phetchaburi Station)
7 Ratchaprarop X
8 Phaya Thai X Image:AB-Kreuz.svg BTS Sukhumvit Line (Phayathai Station)

[edit] Departure tax

Since February 1, 2007 the 700 Baht departure tax was included in the price of flight tickets.[citation needed] Before that date, departing passengers had to pay the tax to officials or vending machines before they entered the immigration queues.[citation needed] Before the opening of Suvarnabhumi Airport, the fee was 500 THB per person.[citation needed]

[edit] See also

[edit] References

  1. ^ Airport information for VTBS at World Aero Data. Data current as of October 2006.. Source: DAFIF.
  2. ^ Airport information for BKK at Great Circle Mapper. Data current as of October 2006.. Source: DAFIF.
  3. ^ USA Today, "Bangkok's new airport opens to first commercial flights", September 15, 2006.
  4. ^ "New airport operations costly to low-cost carriers", MCOT, July 16, 2006 (retrieved July 17, 2006).
  5. ^ Some flight services will likely return the Don Muang Airport, The Nation, January 29, 2007.
  6. ^ The Nation, Engineers unable to agree on root cause of airport cracks, 10 February 2007
  7. ^ The Nation, THAI baulks at moving to Don Muang, 15 February 2007
  8. ^ Thailand backtracks on plan for second international airport, Channel NewsAsia, 16 February 2007
  9. ^ Handley, Paul M. (2006). The King Never Smiles. Yale University Press, ISBN 0-300-10682-3.
  10. ^ ThaiDay, "THAI discounts tickets for historic test flights", July 1, 2006.
  11. ^ "PM Thaksin says Suvarnabhumi Airport ready in two months", MCOT, July 29, 2006.
  12. ^ Pennapa Hongthong, Just listen to our noisy nightmare, The Nation, September 28 2006
  13. ^ Petchanet Pratruangkrai, Suchat Sritama, Exporters pan new export fees, The Nation, 27 September 2006
  14. ^ Kurt Hofmann, LH Cargo set to be first into Suvarnabhumi, ATW, 28 September 2006
  15. ^ Suchat Sritma, Touch down...into chaos, 29 September 2006
  16. ^ e-Travel Blackboard, Baggage ruffles up some feathers, but Suvarnabhumi still a success, 29 September 2006
  17. ^ The Nation, Airport shippers hit by computer failure, 2 October 2006
  18. ^ A Rough Takeoff for Bangkok's New Airport, TIME, January 25, 2007
  19. ^ The Nation, Engineers unable to agree on root cause of airport cracks, 10 February 2007
  20. ^ New airport's east runway to close for repairs, return to Don Muang mooted, Thai News Agency, MCOT, January 27, 2007.
  21. ^ "Bangkok airport officially unsafe", CNN, 2007-01-27
  22. ^ Bangkok Post, Suvarnabhumi: No cracks, minor damage, 2 February 2007
  23. ^ Bangkok Post, Suvarnabhumi runway declared safe, 12 February 2007
  24. ^ The Nation, Competent pilot wanted, 15 February 2007
  25. ^ The Nation, 'Can we get to work please?', 17 February 2007
  26. ^ Bangkok Post, Distress in the tarmac, 11 March 2007
  27. ^ International Herald Tribune, Thailand's airport imbroglio grows, 2 February 2007
  28. ^ Bangkok Recorder, Airport president resigns, 3 February 2007
  29. ^ ETNA, Thailand's new international airport head steps down, 2 February 2007
  30. ^ Asian Times Online, Cracks appear in Thai aviation-hub hopes, 7 February 2007
  31. ^ Use Don Muang during repairs: 2 airlines, The Nation, January 27, 2007.
  32. ^ Move to use 2 airports gets mixed reception, The Nation, January 31, 2007.
  33. ^ Bangkok Post, B1bn needed to fix terminal problems over four to five years, 16 February 2007
  34. ^ Some airlines afraid to use new airport, The Nation, January 26, 2007.
  35. ^ Bangkok Post, New Bangkok Airport - Now Aiming For July 2006 Opening, 2005
  36. ^ Cebu Pacific (2008-09-03). "Cebu Pacific starts Clark Hub on November 8". Press release. Retrieved on 2008-09-03.
  37. ^ "Work starts on link to Bangkok's new airport". David Briginshaw, International Railway Journal, April 2005.
  38. ^ "Bangkok Desiro deliveries begin", Railway Gazette International (2007-09-10). 
  39. ^ "Bangkok Airport Express to change city travel". Railway Gazette International, December 2005.

[edit] External links

Personal tools