MUMBAI MONORAIL PROJECT
 
Layout Plan
SANT GADGE MAHARAJ CHOWK–WADALA – CHEMBUR STATION (20 km)
 
Background:
 

Considering the increase in population, increased travel demand and narrow road networks running through congested structures, there is a need of a system which will occupy less space as well as reduce travel time.

With the objective, to support public rapid transit system such as suburban rail system and metro rail system and where public rapid transit system is not available or impossible to provide such system and where widening of roads is not possible due to structures on either sides, Mono Rail system is proposed to be implemented by MMRDA/GOM.

 
  1. In Monorail System train runs on a narrow Guideway Beam, wheels of which are gripped laterally on either side of the beam.
  2. Monorail is a Light Weight System and its cost of execution is less compared to heavy rail systems and it takes approximately 1.5 to 2 years for execution.
  3. Mono rail System requires 1.00 m wide space (Column Size 0.8 m X 1.5 m) the space of a footpath or a divider and it rests on a single pillar of height 6.5 m without disturbing the existing traffic.
  4. Capacity of 4 car Monorail System is 8000 to 12000 PHPD.
  5. Monorail System can achieve ± 6 % gradient and turning radius upto 50 m.  
  6. As compared to other systems Monorail produces less noise and is eco-friendly and hence easily acceptable in dense residential locale.
  7. Monorail System is in use in Tokyo (Japan) from 1963, in Kuala-Lumpur (Malaysia) for last 5 years and in china for last 3 years.
  8. Monorail System is Safe and reliable system.
 
Recent Monorail systems:
 
Chongqing, China Kuala Lumpur, Malaysia

Chongqing, China

  • Length: 17.4 km
  • Operation Since: 2005
  • Current PPHPD: 17,000
Kuala Lumpur, Malaysia
  • Length: 9 km
  • Operation Since: 2003
  • Current PPHPD: 5,000
 
How Mumbai monorail may look like:
 
Mumbai monorail Mumbai monorail
 
MMRDA proposes to implement a proven and established Monorail System in various parts of Mumbai Metropolitan Region (MMR). It is proposed to initially take up implementation of about 20 kms Monorail System from Sant Gadge Maharaj Chowk – Wadala – Chembur station as a Pilot Project. Completion period of the full project is 30 months.
 
Jacob circle-Wadala Chembur Monorail corridor
 
Salient features of the corridor:
 
  • Length of Pilot Corridor:
    • Section no. 1 = 11.28km (Jacob circle – Wadala)
    • Section no. 2 =   8.26km    (Wadala – Chembur)
  2016 2031
Peak hour peak direction traffic 7400 8300
Corridor Ridership per day(lakhs) 1.25 3.00
Design Headway 3 minutes
Train Composition 4 cars
Train Capacity (4 cars) 568 Max
Design Speed 80 kmph
Scheduled Speed 31 kmph
Operation Hours 0500 Hrs- 2400 Hrs

Journey Time

 
  Section no. 1 25 minutes
  Section no. 2 19 minutes
 
GUIDEWAY:
 
Two Beams on Single Column Structure  
Generally on median of the Road  
94% Alignment on Gradient  
9kms on curves (93 Curves) in 20 kms.  
Horizontal Curve Radius Main Line 100m (Nominal)
  50m (Minimum.)
Pre-cast curved beams  
Design Life 120 Years  
Special Crossings Arrangements at  
  Harbour Line Crossing at Wadala
  Central Railway Crossing at Curry road
  Crossing at Trombay Yard
  Ambedkar Marg flyover
  Flyover of APLR
 
STATIONS:
 
No. of stations 18 Nos
Section 1 11 Nos
Section 2 7 Nos
Around 11.5m Above Ground Level  
Entry – Exits along Sidewalks  
Lifts & Stairs,Escalators (Future)  
Safety as per NFPA 130  
 
TRACTION SYSTEM & POWER DEMAND:
 
  • 750 V dc
  • Power Rails fixed on both side of beams
  • 33kV Receiving Sub-Stations
    • Lower Parel
    • Chembur
  • Traction Sub-stations 5 Nos. (6MVA each)
  • Power Demand ( 2031) (13.39 MVA)
  • SCADA Monitoring
 
SIGNALING SYSTEM:
 
  • Computer based Centralized Train Operation & Management
  • ATC and Line Side LED Signals
  • ATP with Train Describer
  • Traffic Control at OCC & Station Control Room
 
COMMUNICATION SYSTEM:
 
  • Optical Fiber Based Transmission Media
  • Digital Trunk Radio Technology (TETRA Standards) Communication between Motorman, Central Control / Station, Depot, Maintenance Parties, Security Personnel. Mobile Radio Communication
  • Telephone Exchange of 500 lines
  • Passenger Announcement System from Stations & OCC
  • Centralized Clock System
  • CCTV for Surveillance
 
ROLLING STOCK:
 
  • Train Composition
    • 4 cars
    • 15 Nos
  • Shell of Extruded Aluminum ( painted)
  • Driving Cab at Both Ends of 4 Car Train
  • Air-conditioning
  • Single axle bogie, two per car, axle load
    • 11 tons
  • Running wheel with Rubber tyres
  • Stabling and guiding horizontal wheels 3 on each side
 
AUTOMATIC FARE COLLECTION:
 
  • Fare media: Contactless smart token
    • For single journey.
    • or multiple journeys.
  • Gates: Computer controlled retractable flap type automatic gates
  • Ticket office machine (TOM/EFO): Manned Ticket office machine
  • Ticket reader and Portable ticket decoder
  • Passenger Operated Machine/Ticket Vending Machine
  • Power: UPS (uninterrupted power at stations as well as for OCC).
 
PRESENT STATUS
 
  • Consortium of Larsen & Toubro Ltd. India and Scomi Engineering Bhd. Malaysia appointed as implementing agency.
  • Consortium of M/s. SOWiL Ltd, CREEGC Ltd - China and Team One Ltd appointed as Project Management Consultant.
  • Work to be completed by April 2011.
 
Top
 
 
  Projects
  Bombay Urban Transport Project
  Mumbai Urban Development Project
  Shifting of Wholesale Markets
  Wadala Truck Terminal
  Mahim Nature Park
  Mumbai Urban Transport Project
  Mumbai Urban Infrastructure Project
  Mumbai Metro Rail Project
  Niramal MMR Abhiyan
  Skywalk
  Monorail
  SATIS
  Rental Housing
  SWM Special Project Cell
 
  Mumbai
Metropolitan Region
Mumbai Metropolitan Region Map